Nationwide Depots

UK-Wide Delivery

Local Collection

Nationwide Coverage

Tsurumi HSD2.55S Robust Submersible Drainage Pumpss
2 Images

  • Price: On Request
  • Current Stock: Contact us for Availability.
  • Stock Number: Non Assigned

Tsurumi HSD2.55S Robust Submersible Drainage Pumpss

The HSD.55S is a lightweight and robust single-phase drainage pump, with an agitator and impeller in chromium iron to minimize clogging and increase wear resistance when pumping sand carrying water, sludge and bentonite. The hydraulic design features a double mechanical seal, with an oil lifter, for positive seal lubrication in any operating position. The high-performance motor enables long periods of operation while partially submerged. Available as manual or with a pendant float switch, for automatic operation.


  • Technical Data
    Condition New
    Manufacturer Tsurumi
    Model / Part HSD.55S
    Outlet (BSPM/mm): 2"/50
    Motor output (kW) 0.55
    Phases 1
    Max head (m) 13.2
    Max flow (I/min) 220
    Free passage (mm) 10
  • Model Variants
    Model Manual/Auto Outlet Volt kW Flow Head
    Model: HSD.55S Manual/Auto: Manual Outlet: 2 inch Volt: 230 V kW: 0.55 kW Flow: 220.00 l/min Head: 13.20 m
    Model: HSD.55S Manual/Auto: Automatic Outlet: 2 inch Volt: 230 V kW: 0.55 kW Flow: 220.00 l/min Head: 13.20 m
  • Downloadable Documents

Enquire about this product


I’m happy to receive news and exclusive offers via email

Thank you for your enquiry - we'll get back to you as soon as we're able.