Nationwide Depots

UK-Wide Delivery

Local Collection

Nationwide Coverage

Stravo Mizar/S Industrial Submersible Pumps
2 Images

  • Price: From £367.65 Excl. VAT
  • Current Stock: Contact us for Availability.
  • Stock Number: Non Assigned

Stravo Mizar/S Industrial Submersible Pumps

Introducing our Mizar 60/S pumps, crafted from durable 316 stainless steel and Viton, featuring a water-cooled, top discharge design ideal for space-restricted settings. These pumps excel in partially submerged operation or short dry running periods. For eco-conscious operation, they utilise a biodegradable hydraulic fluid derived from vegetable oil. Choose from manual or automatic options with a pendant float switch. Perfect for environments demanding enhanced chemical and corrosion resistance beyond 304 stainless steel. Note: Not suitable for ponds or water features.

The selection of a pump must initially meet the basic corrosion resistant standards, however additional mechanical or physical properties in the duty may also need to be considered to achieve the overall service performance required. Please contact our sales department for guidance before selection.


Enquire about this product


I’m happy to receive news and exclusive offers via email

Thank you for your enquiry - we'll get back to you as soon as we're able.