Stuart Group Project Images
December 2007 - Royal Residency, Surrey.
Installation and commissioning of a FG Wilson 1875kVA diesel standby generator to a Surrey-based royal residency. Images show generator being craned into acoustic container; being lifted onto 40 foot lorry trailer ready for transportation; and being craned into position at site.
(17 images).
To Project: Health Protection Agency, London





